Project Details

The construction of a new 22-mile double-circuit transmission line from the Viola substation to the Clearwater substation included dismantling 11.7 miles of an existing transmission line from the Milan tap to the Clearwater substation .

  • Location:
  • Owner:
  • General Contractor: